Sanitation Vehicle Station
For new energy sanitation vehicles, they have slow driving speed, fixed driving route, fixed working time and fixed charging place, but the centralized charging time is relatively scattered.
Charging station composition
Charging pile selection
80kW/120kW/160kW dual guns, 400kW split one machine with ten guns.
Power distribution
Box-type substations, low-voltage cables, low-voltage distribution cabinets.
Canopy
Photovoltaic canopy, membrane structure canopy.
Operations management system
You can choose from various schemes such as QR scanning charging, card swiping charging, plug and charge, etc. according to the needs of users.
Monitoring system
Pan-tilt cameras, intranet cameras and communication network.
Fire-fighting system
The distance between buildings or parking places will meet fire protection requirements. The design of the entrance and exit of the site will meet evacuation requirements of a parking lot. The charging station will be equipped with fire sand tank, dry powder fire extinguisher and fire alarm system.
Communication system
In combination with the charging station access to the power system, the charging station is connected to the external and internal network by optical fiber or network cable, and linked to the charging operation management system through wireless router or optical fiber routing.